ALLEN CO., Ind. (ADAMS) – The Indiana Department of Transportation has announced lane closures on S.R. 3 in Huntertown for bridge construction.
Crews are scheduled to begin working on the bridge between Gump and Shoaff roads on or after June 13, with work expected to last until the end of October. All work is weather-dependent and schedules are subject to change.
During construction, the left lane in each direction will be closed in the work zone. There is a speed limit of 45 mph and a width limit of 12 feet.
INDOT reminds drivers to consider worker safety and slow down, use extra caution and drive distraction-free when traveling in and around all work zones.